Fold the top over the roof ridge and cut the bottom along the drip edge metal.
Roofing open valley nail through metal.
First clean the debris out of the valley including sawdust nails and whatever else is in there.
Shingle the other side of the valley the same way.
Lap successive sheets of metal flashing a minimum of 12 inches and seal laps.
Place corner pieces where panels will meet bends at the edge of the roofing.
When properly installed w valley flashing will reliably channel run off water down the roof and into the gutter.
Roof one side of the valley running the shingles across it.
With a roll roofing valley keep the nails at least 6 inches from the valley centerline.
If there are gutters installed on the eaves the eave flashing should be installed to overhang the lip of the gutter by about 1 2 inch.
Use 1 1 4 inch nails to cover the outline of the roof with strips of metal eave flashing also called edging.
W valley flashing protects the critical area of your w valley flashing protects the critical area of your roof where two slopes come together to form a valley.
And speaking of nails they shot nails through the eves that are clearly visible and truly unsightly.
But the shingles seem to be nailed through the metal about 6 outside the bottom of the valley which contradicts the no nailing through the metal.
Clip the top corner of shingles along valleys to keep water flow toward center of valley.
Beacon building products nasdaq.
Install synthetic roofing underlayment or felt paper according to manufacturer specifications and then install the first piece of valley flashing.
The correct way to fasten steel panels with nails is to drive the nail through the top of the rib so the washer is compressed securely against the metal.
Stop nailing 6 inches from the center.
Becn is one of the largest distributors of commercial and residential roofing products complementary construction and building materials serving the entire united states and six canadian provinces.
Over driving the nail can split the washer and dimple the metal causing leaks.
Nail placement must be in the ribs for roofing ap plications to minimize the potential for roof leaks.
Shingles should overlap the valley lining by at least 6 inches.
Snap a chalkline 2 to 3 inches past the valley center on the top layer of shingles.
Apply an approximately 3 inch width of asphalt roofing cement along the sides of flashing and embed shingles in mastic.
Seal each shingle to the liner and overlapping shingle with a 3 inch wide bead of plastic roofing cement.
With a clean valley you can lay down some peel and stick roofing membrane.
Most state to use clips on the long sides of the valleys to allow the metal to expand contract as needed and to not nail the metal in place.
With a metal liner nail 1 2 inch outside the liner.
Looking into all the options the benefits made the investment worth it.