Save yourself some.
Roof shingle installation drip edge.
If it doesn t pull the drip edge out slightly from under the shingles.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Always install flashing around a chimney and other valleys where two roof planes meet as these areas are more prone to leaks if not protected.
T shape drip edge is an l shaped flashing in which the long leg folds back on itself before heading down 90 degrees to form the short leg.
How to fix a roof drip edge installing roof drip edge flashing properly.
Install roof drip edge along the eaves add underlayment then place drip.
How to install a drip edge.
Nail the starter strip about 3 up from the leading edge using 4 nails evenly spaced for a full strip approximately 10 12 inches apart.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Place the metal roof drip edge flashing along the gable ends.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
It is also sometimes called d metal for drip.
Nail the drip edge in place using your hammer and roofing nails.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Drip edge roof flashing types.
It can be done.
Install the starter strip so that it overhangs the drip edge by 1 2 inch.
Make sure the outer edge extends over the gutter.
Once all the underlayment is applied go back and place.
Secure the drip edge with roofing cement.
Once free slide the drip edge out and discard.