Under the bur roofing was a base sheet of felt and plywood roof sheathing.
Roof engineer report.
The fiberboard was fully saturated and it had lost all of its strength.
Haag has a nearly century long track record of analyzing damage caused by weather phenomena including hail snow ice wind storm surge flooding lightning tornadoes and hurricanes.
Use of this report of findings shall constitute agreement by all parties involved that the inspection and report is provided on a limited liability basis the maximum liability for which the inspector engineer and or trinity engineering pllc and its affiliates may be held liable for errors and omissions negligence or from damage of surrounding roofing products that may cause any issues shall be limited to the amount of the fee paid for this inspection.
6 roofing felt 7 flashing 8 rafter 9 purlin 10 ceiling joist 11 pot 12 cement 13 hip roof 14 hip tile 15 gutter 16 fascia 17 soffit 18 eaves 19 roof truss 20 barge board 21 soil and vent pipe 22 damp proof course dpc 23 damp proof membrane dpm 24 inspection chamber 25 cavity wall 26 solid wall 27 foul drain 28 gulley 29 floor joists.
One engineer s report for a client that was used to deny an insurance claim for a church with a wind damaged roof incorrectly described a tongue in groove roof covering as plywood sheathing identified the wrong date and the wrong windstorm when he incorrectly reported low wind speeds and failed to identify and record the fact that the steeple had been lifted and moved by a 100 mph wind.
Our engineers will investigate damage to roofs due to design problems construction deficiencies excessive loading weather and seismic events mechanical damage maintenance issues and other causes.